Job Information
Commissioning Engineer
Overview
Job Category: Oil & Gas
Sub Category:
Job Type: Contract
Job Shift: Day
Duration:
Zipcode:
Posted: 18-01-2019
Requirements
Gender: Does Not Matter
Age: 25 Years - 25 Years
Minimum Education: University
Degree Title: Engineering
Minimum Experience: 8 Year
Career Level: Experienced (Non-Manager)
Work Permit:
Required Travel:
Job Status
Job Status: Sourcing
No of Jobs: 0
Start Publishing: 18-01-2019
Stop Publishing: 17-07-2019
Description

1   To promote HSE behaviour within the commissioning activities and verifies that HSE procedures are implemented by commissioning team.

  1. To develop a strategy in order to minimize offshore commissioning and minimize lost time due to interfaces.
  2. To define, mobilize and manage an organization which will cover the preparation and the execution of commissioning
  3. To manage the preparation of precommissioning/commissioning procedures and reporting tools (including technical database when applicable, planning, punch list control).
  4. To manage the execution of commissioning to achieve maximum productivity, minimize cost and achieve smooth hand over.
  5. To co-ordinate with other project entities/existing facilities.
  6. To supervise the reporting of commissioning execution to ensure that all technical, contractual and cost information is properly recorded, collected and available for inspection/reference as required by law regulations and company policies.
  7. To supervise the schedule of commissioning in order to reach the planned end date
  8. Commissioning preparation phase :

-       Responsible for the review and the approval of the various commissioning preparation tasks to be performed by the Contractor : work repartition , priorities, resources, schedule, coordination of the preparation team.

-       Review and approve the commissioning management procedures (hand over, interfaces, punch list, internal organisation…).

-       Review and approve the commissioning dossiers prepared by the Contractor (including database populating and operational test

procedures writing).

-       Coordinate activities of the Company commissioning supervision team (system engineers, discipline supervisors, planning / punch list controller).

-       Identify and address all interface issues with other project packages with respect to commissioning.

-       Prepare overall commissioning plan.

  1. 10. Commissioning execution phase :

-       Responsible for the overall safety of commissioning activities.

-       Responsible for witnessing and monitoring the precommissioning activities performed by the Contractor.

-       Countersign all precommissioning dossiers at Ready For Commissioning (RFC) status.

-       Control all commissioning activities performed by the Contractor.

-       Check progress against planning and recommend any necessary corrective actions, close follow up on punch list.

-       Ensure correct reporting of commissioning activities in time frame.

-       Report immediately any unexpected events which may affect the commissioning of the plant or the start up

-       Review and approve the commissioning dossiers after completion of commissioning activities and sign the Ready For Start Up and hand over certificates

  1. 11. Any other related activities that may be assigned by the hierarchy
Agreement
Qualifications
Prefered Skills
Apply Now